Brentwood Public Library — Brentwood, CA

At the Cross Section of Community

 
Brentwood Public Library CLT Panel Installation
Size
22,500 SF
Architect
FOG Studio
Mark Davis Design
Contractor
Lathrop Construction
Photographer
Blake Marvin

The City of Brentwood has upgraded its public library to better serve as a central community hub. A new two-story main library building and adjacent one-story community room replaced the former library, paving the way for the innovative use of emerging mass timber building materials. Holmes provided structural engineering design for the project.

Holmes met the architect’s request to showcase CLT (Cross-Laminated Timber), a material gaining traction in the US for its warm, inviting aesthetic and sustainable qualities. FOG Studio was the first architectural firm to use CLT in California and sought to further push the material’s potential. A CLT diaphragm on the roof and floor plates uses plywood splines and screws to drag an earthquake’s lateral load into steel moment-resisting frames. Additionally, a double-height space over the lobby draws visitors’ gazes to an exposed CLT ceiling and exposed steel framing.

Brentwood Public Library truck unloads CLT panels
BrentwoodPublic Library Construction Cross Section with CLT
Aerial shot of Brentwood Public Library CLT Installation
Brentwood Public Library finished facade with CLT roof

The main library building includes a children’s area and storytime nook on the ground floor, as well as additional library space on the upper level. The building is organized around a central double-height space with a feature stair. A seismically separate one-story community room stands adjacent to the main library. The two structures are connected with a central exterior courtyard featuring plants native to California in an arrangement of filtration planters.

Brentwood Public Library Interior with kids. books and CLT Diaphragm

More Projects

View All

Get in Touch

We would be pleased to speak to you about your project.

Contact Us